C-24.2, r. 37.1.01 - Pilot project for traffic on public highways comprising a roadway with a two-way centre lane

Full text
8. The person responsible for the maintenance of a public highway must install the signs specified in the second paragraph to indicate the start or the continuation of a roadway with a two-way centre lane. The person must also install the signs in the manner indicated in the standardized drawings in Schedule II.
The sign shown below indicates the start or the continuation of a roadway with a two-way centre lane.
M.O. 2024-14, s. 8.
In force: 2024-07-03
8. The person responsible for the maintenance of a public highway must install the signs specified in the second paragraph to indicate the start or the continuation of a roadway with a two-way centre lane. The person must also install the signs in the manner indicated in the standardized drawings in Schedule II.
The sign shown below indicates the start or the continuation of a roadway with a two-way centre lane.
M.O. 2024-14, s. 8.